Post Offer Free
Shanghai Beyond Machinery Co., Ltd  

Gold Index: 10904

You are here: home  > Smart Integrated Industrial Yogurt Making Machine For Dairy Production Line

Smart Integrated Industrial Yogurt Making Machine For Dairy Production Line 

Place of Origin: Zhejiang, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: BY-PM

 
Smart integrated dairy production line for standardized milk, yoghurt processing with bottle p

 

Smart integrated dairy production line for standardized milk, yoghurt processing with bottle package

 

Description:

Shanghai beyond machinery co., ltd is specialized in supplying various kinds of milk processing line, including the pasteurized milk, UHT milk, flavored milk, yoghurt, cheese and butter, cream, condensed milk etc.

Shanghai Beyond can supply complete turnkey projects for customers, integrating with designing, equipment manufacturing, to installation and commissioning and also training the operators.

Yoghurt processing line: milk transporting tank or vessels, milk filter and collection tank; cooling and storaging tank(milk chilly tank), Mixing/Blending and milk standardization, cream separation, homogenization, pasteurization(usually using plate type pasteurizer), homogenization, fermentation , and filling

Features and advantages:

1. Processing capacity can be ranged from 2T/Day to 1000T/Day.

2. High standard design, manufacture and project installation requirements, which guarantee the first-class finish products in the dairy processing line.

3. PLC control the whole production line, saving labor force and facilitate production management.

4. Full-auto CIP cleaning, to ensure whole production line equipments meet food sanitary safety requirements.

5. Whole line with features as high level automatic, low labour intensity, easy operation, safe function and low operation cost.

6. Whole line adopt sanitary design, can be cleaned thoroughly, with high level sanitation.

CONSTRUCTION FEATURES
Working capacity from 5 tons/d up to 100 tons/d
Products - Stirred yogurt
- Stirred yogurt with fruit puree or flavor
- Yogurt with cereals, fibre
- Set yogurt
- Drinking yogurt
- Frozen yogurt
- Concentrated yogurt
- Kefir
- Package in cup, gable top carton, bottle

 

Specifications:

Brand Name: Shanghai Beyond
Model Number: BY-YL
Capacity 5-200TPD
Raw material

Fresh cow milk, buffalo milk, goat milk, camel milk

or milk powder, or both mixed

End product Set yoghurt, stirred yoghurt, Lassie, Yakult
Shelf life 20-25days
Final product fat (%)

Semi-skimmed or double toned milk (1.5%);

Full cream(3% or 6%); Toned milk(3%)

SNF 8.5%(min)
Fresh milk inlet temperature 4
Fermentation temperature 45 (5-8hours)
Package for end product Plastic cup, plastic bags, glass bottle, PET bottles
Certification: ISO9001/CE/SGS
Main material for machines SUS304 or SUS316
Place of Origin: China
Manufacturer history More than 10years
Voltage 380V 50Hz/110V 60hz/415V 50Hz
Power consumption(Kw) energy saving type, about 100-500kw,
Operator needed About 6-20persons
Cooling water consumption About 80-300M3
Steam consumption About 300-5000T/H,
Factory space needed About 500-5000Sqm
Warranty 12 months after commissioning
After sales service Engineers available to service machinery overseas

 

*Delivery time:

120 days after receive TT deposit or formal 100% L/C, upon approval on technical drawings and specifications by client.

 

*Duration of Guarantee:

 

1. within 12 months since the installation and commissioning of equipment are finished, If the defects of equipment and spare parts result from the seller, the seller will supply spare parts and maintenance by free of charge. If the defects result from the buyer’s improper use of equipment, seller will charge the cost of maintenance and spare parts.

 

2. After 12 months since the installation finished, if the equipment and spare parts are defected, the seller will charge the cost of maintenance and spare parts.

 

3. If Buyer request Seller and engineer to Buyer's factory, buyer should supply seller’s workers the round trip air tickets and subsidary for each worker per day. And the local traffic, accommodation and lodging fees should also be available.

 

*Installation terms:

1. 50-60 days for installation and commissioning.

 

2. BEYOND CO., provide installation, commissioning of all equipment supplied by BEYOND CO., as stated in the quotations.

 

 

 

 

bigPhoto
 Mr. Ms. Cindy Qian

Tel: 86-21-57172333
Contact to this supplier

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Shanghai Beyond Machinery Co., Ltd [China (Mainland)]


Business Type:Manufacturer
City: Shanghai
Province/State: Shanghai
Country/Region: China (Mainland)

You May Like:

Product (209)